Your facility already does the hard part.

Interconnection, footprint, and year round thermal demand. We bring the compute, return the heat, and you share in the value.

01
Displaced gas

Heat that offsets your boilers

Recovered heat feeds your hot water, digesters, or district loop and directly displaces purchased gas.

Aligned economics

Share in the value

The site earns and you participate, on transparent cost plus terms for the life of the deployment.

Zero burden

MicroLink deploys capital

Your team runs your plant, not ours. No capital outlay, no operating load, no new headcount.

The thermal math · a representative 80 MW deployment

What a deployment returns to its host.

Recoverable heat at the data center68 MW thermal
Heat delivered to the host system20 to 22 MW thermal
Natural gas displaced660,000 Mcf/yr
Host gas cost avoided$3.2M to $7.2M/yr
CO₂ avoided for the host36,000 t/yr
Loop temperature delivered40 to 65°C (104 to 149°F)
Heat source availability24/7 constant
Cost to the host's ratepayersnone

Dry coolers on the always open reject path are sized for the full load, so your offtake never constrains the compute and the compute never waits on your demand.

Illustrated aerial view of a water treatment facility beside a river
The model02

Heat, power, lease.

The differentiator

Heat recovery

Liquid cooling recovers heat at 40°C to 65°C (104°F to 149°F) and delivers it into your useful systems.

The commercial engine

Behind the meter

Power secured below grid retail by sitting behind the meter, avoiding transmission, distribution, and capacity charges.

The anchor

Long term lease

A long term facility lease anchors the deployment on your balance sheet terms, and you share in the value the site creates.

From conversation to commissioning03
1

Site assessment

Desktop review of your power, thermal demand profile, and footprint. Two weeks, no cost, no obligation.

2

Term sheet

Heat price, value share, and footprint agreed in a short form document before any engineering spend.

3

Design and permits

We carry the engineering and approvals. Your operations team reviews every interface drawing.

4

Build and commission

Modular construction off your critical path. First heat delivered at energisation.

The architecture04

Our Data Centers, like libraries, will add to our architectural histories.

We treat the building as permanent civic infrastructure, not a shed. Where a city invites us in, the design answers to its street, its skyline and its history.

a scaled section drawing of a MicroLink deployment showing a north light sawtooth glasshouse over a concrete podium plant room, with a water basin, earth berm and finned dry cooler bank.
Start the assessment06

If your facility buys heat,
we should talk.

Request a site assessment